worldwater logo graphic
contact
home
site map
Company link applications link products link projects link financials link solar energy link News link
california
delaware solar projects
new jersey solar projects
solar powered disaster relief
International solar projects
testimonials
california Solar Projects
Lehr Brothers, Inc. – Big L Packers

EDISON, CALIFORNIA

The Lehr Brothers run a food processing facility near Bakersfield.  WorldWater & Solar Technologies, Corp. sized the solar power system to offset the on-site electrical usage charges for the facility’s 350 horsepower hydracooler compressor pump and other equipment.  The installation was completed in March 2003.

The total of 119 kW of PV arrays provides an average of 565 kW hours per day of electricity.  In addition, the 10,000 square feet of array space is on two raised structures, which provide much-needed shade for farm equipment in the hot Bakersfield sun.  During the off-season, the solar-generated electricity builds sufficient credit, via net metering, to reduce the Lehr’s annual electric usage bill to zero.

solar panels and large hydrocooler

WorldWater is saving us over $30,000 a year - testimonial

large solar array on farm

See our solar energy systems at work!

For real-time monitoring of energy usage and generation at Lehr Brothers, click here: Lehr Brothers

greenline

California Solar Projects
Cerro Coso D.T. Locke Ranch Lehr Brothers
Seley Ranches
Valley Center MWD  
HOME COMPANY APPLICATIONS SOLAR PRODUCTS
FINANCIALS NEWS SOLAR ENERGY INFO
SITE MAP CONTACT